Repulse Dam on River Derwent

THR Software Modernisation Project

Premise

Previously in 2012, alongside partner companies, we developed a system to monitor the corrosion of steel cables in post-tensioned concrete. In 2017, we were again approached by Hydro Tasmania to conduct the THR software modernisation project.

Description

Repulse Dam on River Derwent

One of the major goals was to integrate the THR system into the rest of Hydro Tasmania’s infrastructure. Thus the existing proprietary data controller had to be replaced with a Campbell Scientific logger and required changes to the interfacing hardware.

We worked alongside the same partners (Custom & Contract Power Solutions (CCPS), Independent Integrity Testing (i2t) and Entura) to bring the software modernisation project to fruition.

Devious Solutions installed the new system in the Repulse Power Station. Repulse is upstream from the previous project in Meadowbank Power Station on the River Derwent.

Challenges

Replacing the existing controller required us to undertake the following tasks:

  • changing the control language from C to CRBasic
  • meeting the end client’s data requirements
  • updating the communications protocol to be compatible with CRBasic’s best practises
  • first full on-site integration testing
  • adapt to any unforeseen integration issues at install
  • post installation support

A bank of (software) modernised sensors

Outcomes

Devious Solutions delivered the project on time and on budget. As of October 2018, the project is still in the prototype phase and is still being reviewed by Hydro Tasmania and Entura. We’re looking forward to deploying more systems in the future!

Meadowbank Dam on full flow

THR Monitoring System

Premise

In 2012, a pilot scheme was initiated by Hydro Tasmania to establish a suitable, non-destructive monitoring technique to determine the health of steel cables in post-tensioned concrete. At that time, the methodology consisted of manually inspecting the cables once per annum. The process would take a team a few days to complete.

Some of the hydro-electric dams have been in use for at least half a century and were expected to have a range of steel cable corrosion.

Description

Working in conjunction with Custom & Contract Power Solutions (CCPS) and Independent Integrity Testing (i2t), a prototype system was developed to automatically monitor the state of health of the steel cables in post-tensioned concrete. Design and development of the system began in May 2012, and the first on-site readings were taken in June.

Devious Solutions was responsible for developing the embedded monitoring system. The monitoring system consisted of an embedded Linux device performing various duties:

  • communicating with CCPS’ proprietary sensors over RS-485
  • providing external FTP access to allow the client to collect data
  • providing a web interface for managing the system
  • developing an online system to aggregate and display recorded data

Other responsibilities included:

  • liaising with the end client to produce software requirements
  • designing, implementing and testing the system
  • providing on-going support during the prototyping phase of the project

Most readings are taken daily, some (like temperature data) are taken more regularly. The data is stored locally in the monitors but provides an Ethernet port for remote access and control. The system is self-contained and thus not connected to the outside world.

When the team arrived on site, they worked alongside Entura to deploy the system.

Whilst originally conceived as a 12-month feasibility study, the sensors installed in Meadowbank Power Station are still in use at the time of writing (September 2018).

Two boxes side by side, left one containing the THR sensor, the right box containing the THR monitor. They look quite spiffy.

One handsome devil checking the system deployment on-site.

 

 

Challenges

The monitoring system had to be low power, and this came with some compromises for the hardware platform, including limited storage memory and not having a memory management unit.

Due to the nature of the site, the non-destructive monitoring system software and hardware platform had to be robust. The system had to be able to withstand sudden data loss. Although the system had an inbuilt battery backup, it was within the scope of the project that the batteries would deteriorate over time and might not keep the system sufficiently powered during a prolonged shutdown. This necessitated the use of a real-time clock (RTC). Due to the limitations of the hardware platform, the time had to be queried via RS-485 from a dedicated chip if the embedded monitor lost its time.

The system also had to be IP 67 rated (dustproof and waterproof). In fact, it would later transpire that one of the sensors became entirely submerged due to heavy rains!

Outcomes

The project was delivered on time and on budget. Initially, the prototype phase was to last until June 2013 but was extended until the end of 2013. The prototype system is still functional and to be used indefinitely.

In 2017, Hydro Tasmania sought to install more sensors in another hydro-electric dam (Repulse) and sought to better integrate the THR sensors with their existing SCADA infrastructure. At the time of writing, it is their intention to deploy the system across more assets. Read more about the extension project here.